Shorelandr SLR50TCBL User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 14
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004287
Page 7 of 14 11/01/2010
R SERIES
The R-series roller rack is installed by placing the roller
arm assembly mounting channel over the rear cross
member and securing in place with a 1/2” x 4-1/2” hex
bolt and lock nut. (See Diagram A). Note that it should
be left loose until the boat is placed on the trailer. Once
the proper position is determined, it may be tightened.
Repeat on the other roller arm assembly.
The short stabilizer bunk is installed to the adjustable
bunk bracket on the front cross member with a 3/8” x 1”
hex bolt and lock nut. (See Diagram A).
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Comments to this Manuals

No comments