PT1415-00 & PT1415-03 1500 LB. PONTOON TRAILER Shoreland’r offers its product line in painted finishes. When or
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004346 Page 10 of 10
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004346 Page 2 of 10
TONGUE Locate the proper length tongue. Insert the rear of the tongue into the frame tongue channel until the Midwest Industries, Inc. Ida Grov
mounting holes line up. Locate the wire harness. Unwind and insert the end with the two plugs that mate with the frame harness into the hole and route
Raise the front of the springs up so they align with the front hole of the spring bracket. Secure in place with 1/2” x 3” hex bolts and 1/2” flange lo
TIRE AND WHEEL ASSEMBLIES Mount the tire and wheel assemblies using the 1/2” fine threaded tapered lug nuts provided. Tighten to 85-95 ft/lb. of torqu
FISHING SERIES WINCH POST Position the winch post on the tongue and secure in place using 3/8” x 4” hex bolts. Secure with 3/8” flange lock nuts. Tig
SMALL PONTOON WINCH POST Position the winch post on the tongue and secure in place using 1/2” x 3 9/16” x 3 7/8” square u-bolts. Secure with 1/2” flan
Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028 www.shorelandr.com 0004346 Page 9 of 1
Comments to this Manuals