Shorelandr SLB30BLW User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 10
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003432
Page 7
WINCH POST ASSEMBLY
The height that the bow eye is placed in your boat will deter-
mine the length of winch post required. Once this is deter-
mined, attach the winch base to the tongue with three 1/2” x
4” carriage bolts and lock nuts.
Align the holes in the Profile 2000 mounting channel with
the holes in the top of the winch base. Attach the front of the
winch head mounting channel to the base by placing a 1/2”
x 4-1/2” hex bolt through the hole closest to the front of the
winch base. Secure with a lock nut. Do not tighten.
Note that the winch head can now be rotated either up or
down. Identify the correct hole combination to use to po-
sition the bow eye roller just above the bow eye of your
boat. When determined, secure in this position by plac-
ing the bushing as shown in Diagram C inside the winch
base so it aligns with the hole just identified for the
proper adjustment. Insert another 1/2” x 4-1/2” hex bolt
through the determined mounting hole in the mount-
ing channel and winch base making sure the bolt passes
through the bushing as well. Secure with a 1/2” lock nut.
Tighten all bolts.
Page view 6
1 2 3 4 5 6 7 8 9 10

Comments to this Manuals

No comments