Shorelandr SLXR30BXLW V.1 User Manual Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 10
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003440
Page 3
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts
and sort by size.
XR SERIES
The XR-series roller rack is installed by placing the roller
arm assembly mounting channel over the rear cross mem-
ber and securing in place with a 1/2” x 4-1/2” hex bolt and
lock nut. (See Diagram A). Note that it should be left loose
until the boat is placed on the trailer. Once the proper posi-
tions is determined, it may be tightened. Repeat on the other
roller arm assembly.
The short stabilizer bunk is installed to the adjustable bunk
bracket on the front cross member with a 3/8” x 1” hex bolt
and lock nut. (See Diagram A).
Page view 2
1 2 3 4 5 6 7 8 9 10

Comments to this Manuals

No comments