Shorelandr LUV40TBXLW V.3 User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 14
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003671
Page 12 REV C 12/17/2007
EQUILOAD DOUBLE BUNK ASSEMBLY
Locate the carpeted bunks. Lay two of them upside down on the
oor so they are spaced approximately 3 ½” apart. Remove the
nuts and lock washers from the bolts that are in the bunks.
Locate two of the double bunk brackets. Position them upside down
so that the holes in the double bunk brackets align with the bolts
from which the nuts were just removed. Drop into position and se-
cure with the lock washers and hex nuts just removed. Tighten but
do not over tighten because they may have to be adjusted to t the
trailer cross members.
Turn the bunk assembly upright and place on the trailer so that the
double bunk brackets drop down around the cross members so
one leg of the brackets is on each side of the cross member. Align
the proper hole in the double bunk brackets with the correct hole
in the cross members. Insert a 3/8” x 3 ¾” hex bolt into the aligned
holes. Secure with a 3/8” ange lock nut. Tighten. Tighten the nuts
left slightly loose when assembling the bunks.
Repeat the above process on the bunks for the other side of the
trailer.
Page view 11
1 2 ... 7 8 9 10 11 12 13 14

Comments to this Manuals

No comments