Shorelandr LURE22LTSH V.1 User Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0004035
Page 9
REV B 08/09/2011
SPRINGS
Positions the axle so that it is aligned with the trailer.
Place the springs on the top side of the spring pads welded to the
axle. (See chassis) The hook end of the spring must be mounted
to the rear of the trailer. Place a spring clamp on the top center of
the spring. Place the 1/2” X 6-1/2” U-bolts over the top of the spring
clamp, spring and axle. Place the spring and axle U-bolt plate onto the
ends of the two U-bolts. Secure in place with 1/2” lock nuts. Tighten.
AXLE
Place a spring bracket bushing (Ref.#6) into the rear of the spring
bracket and secure with a 9/16” x 3-1/4” hex bolt and hex lock nut.
Repeat in the other spring bracket. Position the axle under the frame,
hook the hook loop of the spring around the bushings just installed.
Note: If the axle is positioned too low, the hooks will not hook around the
bushings.
Raise the front of the springs up so they align with the front hole of
the spring bracket. Secure in place with 9/16” X 3-1/4” hex bolts and
lock nuts. Tighten all axle U-bolts and spring bolts.
TIRE & WHEEL ASSEMBLY
Mount the tire and wheel assemblies using the 1/2” ne threaded ta-
pered lug nuts provided. Tighten to 85-95 ft./lb. of torque using the ro-
tation pattern as shown in the ShoreLandr’s Owners Manual.
Re-torque the lug nuts after 50 miles of driving and then
periodically thereafter.
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments